WebMar 24, 2024 · In the 2024 NEC, the lighting load would be calculated at 300,000 ft2 × 3.5VA/ft2 for a total load of 1,050,000VA on the service. If the service supplying the building is 480Y/277V, 3-phase, this adds a total of about 1,260A of capacity to the required electrical supply for the building. All things remaining equal in the 2024 NEC, that 1,260A ... WebDec 14, 2006 · Question 2: Can I say that the service will see a total of six elevators, and therefore use the 79% demand factor at the service level. An Analogy: If I were talking about a two-family dwelling unit, and if each unit of the duplex had only three fixed-in-place appliances, then I could not use the 75% demand factor of 220.53 for a feeder to a ...
Diversity Vs. Demand: Don
WebAug 29, 2024 · This could be helpful. It says, gymnasium demand factor = 70 to 75%; load factor = 20 to 45%. That link takes you to a document that has no meaning in our industry. It does not supersede the NEC. More to the point, it does not apply to the facilities for which the vast majority of forum members spend our work days. WebIn electrical engineering the demand factor is taken as a time independent quantity where the numerator is taken as the maximum demand in the specified time period instead of … chatty pc88
tankless water heater Mike Holt
WebJul 19, 2007 · Location. Lockport, IL. Occupation. Retired Electrical Engineer. Jul 19, 2007. #4. The phrase "water heaters" is one of the things mentioned in 220.56. That is all it takes, in my opinion, to allow us to apply the demand factor. WebNov 13, 2015 · mobile home parks, allowable demand factors for park electrical wiring systems 550 550.31 Motion picture and television studios and similar locations – sizing of feeder conductors for television studio sets 530 530.19 Motors, feeder demand factor … WebDemand factor is the ratio of the sum of the maximum demand of a system (or part of a system) to the total connected load on the system (or part of the system) under … chatty patty uk